Every time it rains,
we worry.

Repeated flooding damages homes, destroys belongings, takes away space families rely on, and causes tremendous health concerns. We are asking the City of Toronto to fix the issues they have known about for decades.

Kewbeach Avenue and adjoining streets, from Woodbine to Waverley, in Toronto’s Beaches neighbourhood near Woodbine Beach.

What we’re asking the City

Part 2 · Kew Beach Neighbourhood Flooding Explained. Neighbours explain how a century of landfill, development and an old combined sewer system leave this low corner of the Beaches flooding with sewage.

Watch on YouTube
Part 1

Video/Audio Historical Neighbourhood Media Coverage of Kew Beach Flooding

Watch on YouTube

Ask our new councillor to make flooding a priority.

Ward 19, Beaches-East York, elected Nate Erskine-Smith to Toronto City Council on October 26. His term begins November 15. Tell him how repeated flooding affects your household, and ask him to help neighbours get answers and lasting solutions from the City.

Share this website with him and with neighbours so they can see the community’s photos, history and requests for City action.

Contact the Ward 19 office

The City’s Ward 19 page lists the councillor’s office contacts. Until the new term begins on , it lists the outgoing councillor’s office; check it after that date for the new councillor’s official contacts.

City’s Ward 19 councillor page

Beach Metro Community News ·

Continued basement flooding after storms has Beach residents desperate for help from city

Residents describe sewage-contaminated basement flooding after the September 2 storm and press the City to act. Toronto Water says it is updating a long-term study of options to reduce flood risk, and that residents can learn about its findings and give feedback in early 2027.

Read the Beach Metro article

CityNews Toronto · Video and article ·

Beaches residents say detention tanks add to flooding woes but City staff disagree

Neighbours tell CityNews that the Kew Beach detention tanks are not drained in time during heavy rain, adding to their flooding. City staff say the tanks are automated, worked properly on September 2, and exist to protect water quality at Woodbine Beach rather than to prevent flooding. They acknowledge that “more needs to be done” and expect results from a flood-risk study next year.

Watch the video and read the CityNews article

Toronto Sun ·

After 20 years of filthy floods, Beaches homeowners demand action

Sleepless nights when it rains. Hesitation about travelling in summer. A basement no longer used as living space. Residents describe the toll of repeated flooding in this report on the neighbourhood’s call for action.

Read the Toronto Sun article

Meet with the City to address decades-old problems.

  1. Health concerns

    Address the hardship, loss and stress of repeated flooding, including concerns about sewage-contaminated water.

  2. Infrastructure

    Improve the drainage. The City says it has already upgraded storm sewers here: set out which upgrades were made and where, what remains from its 2012 study, and when the work will happen.

  3. Kenilworth detention tank

    Investigate the Kenilworth tank’s operation and capacity, publish its operating records, and set a timetable for work to reduce flooding. Why the tank matters.

  4. Flood-risk study

    Share the City’s current flood-risk study for our area with residents, and meet with us before decisions are made. Results are expected in 2027; meanwhile, act on short-term fixes rather than waiting for another report.

The Kenilworth detention tank.

The City’s 2012 study linked local flooding during heavy rain to high tank levels restricting drainage from connected storm sewers and tank water backing up within them.

Read the tank finding · PDF p. 62

What has changed since 2012?

In October 2026 the City told CityNews that the tanks are there to protect water quality at Woodbine Beach, are “not designed as flood mitigation infrastructure”, and worked properly during the September 2 storm. Its own 2012 study found that high tank levels can still restrict drainage from connected storm sewers.

We’re asking the City to reconcile the two: explain what happens at the tank during heavy rain, what has been fixed, and whether the planned upgrades will relieve neighbourhood flooding.

What the studies say, and what still needs checking

How high tank levels restrict drainage. High tank levels can close flap gates and restrict drainage from connected storm sewers. Water upstream then has to rise above the tank-side level before the gates can reopen.

Built to protect beach water quality. The tank is in the park at the foot of Kenilworth Avenue. The City’s 1998 account describes it holding stormwater and combined-sewer overflow, then releasing retained flows toward treatment when capacity is available. Excess flows can overflow to the lake.

What happened to the flood-relief proposals? The 2012 study recommended bypass pipes and a shallow sewer along Kewbeach Avenue (pp. 120–121). It also proposed a Kenilworth outlet redesign pilot and further analysis of lake levels and rainfall (p. 7). The City needs to identify what was done and how it performs.

Upgrades are on the City’s timetable. A March 23, 2026 report lists the Kenilworth and Maclean tank designs as complete, with construction expected to start in 2027 over three years. It does not establish whether that work delivers the earlier flood-relief proposals. 2026 upgrade schedule · p. 4.

Community photos

Neighbours’ photos and videos of flooding around Kewbeach Avenue and adjoining streets.

Shared by neighbours, with permission.

See all community photos

Flooding shared by Kew Beach neighbours

Open the slideshow

A longstanding, ongoing problem.

The City’s 2012 study documented local flooding problems and recommended improvements. These original records help explain why neighbours are asking for action. For neighbours facing repeated sewer backups, “100-year storms” can feel as though they happen every two or three years.

  1. July 30, 2009

    Flooding, sewage backups continue to plague Beach residents

    The East York Mirror reported on Joanne Dicaire’s repeated basement flooding on Kewbeach Avenue and the City’s plans for infrastructure improvements.

  2. 2011

    City study progress report

    The City’s progress report identifies Kewbeach Avenue as a study area.

  3. 2012

    Study findings and recommended improvements

    Historical flood reports, local findings and recommended work.

  4. August 10, 2012

    Beaches residents frustrated with city after repeated flooding

    CTV reported repeated flooding, residents’ frustration and the City’s response.

  5. July 16, 2024

    Flooded roads and TTC stations

    CityNews reports on torrential rain across Toronto and the GTA.

  6. September 2, 2026

    Severe storms cause flooding across the GTA

    CityNews video coverage of the storm.

The Impacted Neighbourhood

The City’s map shows a concentration of reported basement flooding around Kewbeach Avenue and adjoining streets.

Compare the historical reports with the flood-zone illustration shared by neighbours. The labelled map helps locate the streets and the Kenilworth tank.

See today’s pipes on the City’s interactive sewer map . Turn on its sewer layers and zoom in to show storm, sanitary and combined sewers, manholes and catchbasins.

Wider City of Toronto map with large, translucent, overlapping circles showing approximate areas of basement-flooding reports from 2005 and 2008, concentrated near Kewbeach Avenue. A labelled navy diamond marks the Kenilworth tank in the park south of Kewbeach Avenue. Circles do not identify individual properties.

Historical flooding reports

Reports from five storms in 2005 and 2008. The study identifies Kew Beach as one of nine flooding clusters for July 8, 2008 (p. 55).

Enlarge the labelled map

Oblique aerial view of the Kewbeach Avenue area, with red shading along parts of the streets, around buildings and into the park. The community-supplied illustration has no street labels or depth scale.

Community flood-zone illustration

Community illustration, September 2026

Enlarge the flood-zone illustration

Reports: City of Toronto / GENIVAR, 2012 study, Figure 2.2 (map dated March 10, 2010). Basemap © City of Toronto, retrieved September 27, 2026, under the Open Government Licence – Toronto. Street alignment aid: © OpenStreetMap contributors. Tank location: 2012 study, PDF p. 175.

Enlarge mapOriginal map · Figure 2.2 · PDF p. 17Tank location · PDF p. 175Report discussion · p. 14City basemapMap licenceStreet alignment data
Compare with the original map detail Original Figure 2.2 crop, including Kewbeach Avenue and surrounding streets north, west and east.

City of Toronto / GENIVAR · Figure 2.2 · Map dated March 10, 2010.

See the local sewers and surface-flow routes

The City’s 2012 study map shows storm, sanitary and combined sewers, surface-flow routes, low points and the Kenilworth tank. The blue arrows show flow over the ground.

City study map of Cluster 1 around Kewbeach Avenue, with sewer lines, blue surface-flow routes, low points, the Kenilworth tank and original legend.

City of Toronto / GENIVAR · 2012 study · Original map · PDF p. 175 · Enlarge map

For catchbasins and planned changes, see the Waverley proposal drawing (p. 314) and Kewbeach proposal drawing (p. 321). These distinguish existing pipes from proposed work.

Causes of basement flooding

Surface water, sewer backup and leaks can all bring water into a basement.

Causes of basement flooding: blue stormwater backs up through connected outdoor drains; brown sanitary backup rises through the floor drain, sink and toilet. The cutaway also shows manhole inflow, leakage through soil, a sewer blockage and surface water entering the basement. Steps 1–3 appear at bottom left; the typical-connections note is at bottom right.
An illustration adapted from the City’s general diagram (PDF p. 276). Enlarge diagram.
Read the flooding pathways
  • Street water enters the sewer. Ponding can enter through a sanitary manhole cover. This is separate from the street catchbasin feeding the storm sewer.
  • Sewage backs up into the basement. Overload or a blockage can cause wastewater to return through the house lateral and rise through floor drains or other low fixtures—the brown layer across the basement floor. City explanation · p. 272.
  • Damaged pipes add flow. Water can leak between deteriorated storm and sanitary laterals through the surrounding ground; cracks and joints can also admit groundwater. Leakage through soil is different from a pipe cross-connection. Lateral leakage · p. 257; Inflow and infiltration · p. 278.
  • Connections vary. Foundation drains may connect to storm or sanitary sewers. Downspouts can add rainwater to underground pipes, including through improper sanitary connections. The original note allows for interconnected systems.
  • Water also enters from outside. Poor lot drainage, overflowing eavestroughs, plugged downspouts, reverse-slope driveways, leaky windows or doors, and homes in ponding or overflow paths are all shown. Cracked basement walls provide another route.

The accompanying fact sheet also lists foundation-drain and sump-pump failures.

Ask our Ward 19 councillor to make flooding a priority, and share this website.